SectorsChapter 9 · ನಗರ

Maintained cities, every day.

Eight integrated programmes — Day 0–100 Deep Clean, Structural Rebuild, Road Safety, 100% CCTV with civil-liberties rails, Public Toilet Network, Five Amenities flagship, Public Dustbin Network, and the Karnataka Digital Twin. Reactive contractor-driven civic spending replaced with maintained, transparent, citizen-rated infrastructure.

A city is a maintenance commitment, not a construction announcement. Every road, drain, footpath, streetlight, lake, water main, sewage line, bus stop and public building catalogued in the City Asset Registry — with location, age, condition, and published maintenance schedule.
100d
Deep Clean sprint in four largest cities, then phased statewide
8
integrated flagship programmes under one operating rule
KDT
Karnataka Digital Twin — planning surface for every project
100%
CCTV deployed on a published necessity assessment by Year 5, 30-day cap
Cities 2.0
The problem we solve

The structural failures in Cities 2.0.

Karnataka's cities are growing faster than their infrastructure. The failure shows up at street level, every monsoon and every commute.

Flooded streets

Overflowing storm drains. Rebuilt footpaths that crumble within a year. Unsafe pedestrian crossings.

Water + sewage breaks

Shortages in some wards while pipes leak in others. Sewage that pollutes lakes and groundwater. Non-revenue water poorly measured.

Congestion + transit residual

Hours of productive time lost in commute. Bus services treated as the residual mode after metro and private vehicles.

Worker unaffordability

Sanitation workers, gig riders, hospital staff, garment workers — priced out of the cities they keep running.

Road deaths

Pedestrians, two-wheeler riders, cyclists, school children at crossings — the most vulnerable bear the cost of unsafe streets.

The structural cause is consistent: most city spending is reactive, contractor-driven, and not maintained. The Maintain step of the public-project cycle is absent from urban governance.

The architecture

Four institutions. Eight integrated programmes. One operating rule.

Cities 2.0 is built around four institutions that own the maintenance commitment, plus eight flagship programmes that operationalise it on the ground.

I1
City Asset Registry
Every road, drain, footpath, streetlight, lake, water main, sewage line, bus stop and public building catalogued — location, age, condition, published maintenance schedule. Updated continuously by the Karnataka Digital Twin.
Sec. 9.2
I2
Ward-level SLA dashboards
Pothole repair, drain cleaning, garbage collection, water supply, streetlight repair — each with a published SLA at ward level, Standard Escalation Ladder, citizen-rating triggered audits.
Sec. 9.3
I3
Mobility Authority
Integrating buses, BRT, metro, commuter rail, and last-mile under a single planning + ticketing authority. The Authority owns the route plan; operators bid against it.
Sec. 9.4
I4
Lake + Watershed Authority
Karnataka's lakes are flood-control + groundwater recharge + biodiversity. The Authority owns the integrated water plan across the Bengaluru city corporations, BWSSB, peri-urban water bodies, and rural catchments.
Sec. 9.5
P1
Day 0–100 Deep Clean
Surface intervention in the first 100 days for the four largest cities, then phased statewide. Backlog cleared before structural work begins.
Sec. 9.6.5
P2
Structural Rebuild
The 10-year underground fix that follows the surface clean. Roads rebuilt; sewage installed where missing; water mains replaced where ageing; organised pole-line for overhead utilities.
Sec. 9.6.6
P3
Road Safety + Strict Traffic Enforcement
Four pledges: halve road deaths, pedestrian-first design, zero blackspots, golden-hour trauma care. AI-monitored escalation; automatic ticketing from CCTV footage.
Sec. 9.6.7
P4
Karnataka Digital Twin
State-owned 3D record of every city. Every new road project sees what's underground. Every new building tender carries current ground geometry. Citizens see what their ward will look like after a state-funded project.
Sec. 9.8
100% CCTV with strict civil-liberties rails
State-installed CCTV on every public street by Year 5. 30-day rolling retention cap, extended only on a case-file flag, judicial warrant for identified access, KSSL-anchored access log, Independent Audit Board oversight.
How it shows up for you

Four operating loops.

Not promises about future infrastructure. This is how the city runs once Cities 2.0 is operational — for a worker commuting daily, a parent with a child at school, a senior with a mobility need, and a citizen reporting a defect.

A worker commuting daily

Bus on time, ticket on one card.

1

Mobility Authority publishes the route plan; operators bid against it — your bus runs on a schedule the city owns.

2

One ticket — bus, BRT, metro, commuter rail, last-mile. No multi-app shuffle.

3

Real-time arrival and dispatch on JANATA; published on Mission Control.

4

BUS service is a first-class mode, not the residual.

A parent with a child at school

Safe street to school, pedestrian-first.

1

Pedestrian crossings audited under the Road Safety Programme; blackspots auto-flag.

2

Speed-limited zones around schools; AI-monitored enforcement; automatic ticketing from CCTV footage.

3

Footpath defects raised on JANATA → City Asset Registry → Works Corps SLA.

4

Golden-hour trauma care if the worst happens — the 112 line is part of the same architecture.

A senior with a mobility need

Public toilet within walking distance.

1

Public Toilet Network plan published — minimum coverage per ward, accessibility built into the design.

2

Five Amenities Flagship anchors the public realm: toilet, water, shade, seating, signage at every transit node.

3

Streetlight outages auto-raise within 24 hours; SLA published; Open Ledger pays on verified repair.

4

The Lake + Watershed Authority means walkable lake-side recreation, not encroached lake-beds.

A citizen reporting a defect

Raise once, watch it close.

1

Defect raised on JANATA with one photo + location — pothole, broken streetlight, overflowing drain, missing footpath tile.

2

Goes straight to the City Asset Registry; SLA clock starts; Works Corps district unit responds.

3

Milestone evidence (before, in-progress, after) publishes on the Open Ledger.

4

SLA breached? Standard Escalation Ladder fires: ward officer → city commissioner → Grievance Justice Authority.

Implementation roadmap

Foundations in 100 days. Digital Twin in 5 years. Maintained cities for the next 50.

The Cities 2.0 commitments are sequenced — surface first (100 days), structural second (10 years), digital backbone running through both.

0–100 days
  • Day 0–100 Deep Clean active in 4 largest cities
  • City Asset Registry pilot in 5 wards per city
  • Mobility Authority constituted (interim chair named in 30 days)
  • Public Toilet Network plan published per city
Year 1
  • Karnataka Digital Twin pilot live in pilot wards
  • Ward-level SLA dashboards live for top 12 services
  • Lake + Watershed Authority operational
  • Road Safety Programme Phase 1 — pedestrian-first redesign of 100 km of arterials
Year 3
  • Karnataka Digital Twin coverage for all tier-1 + tier-2 cities
  • Structural Rebuild Phase 1 complete in 4 largest cities
  • Mobility Authority unified ticketing live across modes
  • Five Amenities Flagship at every transit node in tier-1 cities
Year 5
  • 100% CCTV on every public street with civil-liberties rails operational
  • All 8 flagship programmes statewide
  • Road deaths halved against baseline
  • Maintain-step SLAs binding across every department
Year 10
  • Maintained cities across Karnataka — zero blackspots, working amenities, transparent civic spend
  • Karnataka Digital Twin export model published under open licence
  • Citizen-rated facility quality at or above audit benchmarks
  • Maintenance discipline embedded in cadre training, not in a manifesto
Headline KPIs · live on the Open Ledger

Six numbers we publish every quarter.

Full set in Vol III App A. Each KPI has a published baseline, Year-1 target, Year-5 target — and where relevant, a Year-10 commitment.

≥50%
Road deaths reductionHalve road deaths by Year 5 against published baseline
100%
Public toilet ward coverageMinimum-standard public toilet within walking distance of every ward by Year 5
100%
City Asset RegistryAll assets catalogued + maintenance schedules published by Year 3
≥95%
SLA complianceWard-level service SLAs met across top 12 services by Year 5
≤90d
CCTV retention capStatutory retention limit; judicial warrant for identified access
≥50%
Public transit mode shareBy Year 10 in cities >5 lakh population
Why this can't quietly be reversed

Why Cities 2.0 can't quietly be reversed.

Cities 2.0 lives or dies on maintenance discipline. Six statutory mechanisms keep it alive across elections.

Maintenance-first statute

Maintain step binding by law

The Karnataka Municipal Maintenance Act ties capital expenditure approval to an audited maintenance plan. New construction cannot start while existing assets are in published disrepair.

Digital Twin under open licence

State-owned 3D record

The Karnataka Digital Twin is state-owned and published under open licence. A future government cannot quietly sell the data, lose the record, or replace it with a vendor-locked alternative.

CCTV rails written into statute

30-day retention, judicial warrant

Civil-liberties rails on CCTV — 30-day rolling retention cap, extended only on a case-file flag, judicial warrant for identified access, KSSL-anchored access log, Independent Audit Board oversight — are in the enabling Act, not in policy.

Lake Authority insulated

Independent statutory body

Lake + Watershed Authority has a fixed-term retired-judiciary chair + civil-society members. Lake-bed encroachment requires Authority approval; encroachment without it is a criminal offence.

Open Ledger publishes everything

Every contract, every defect

Every ward SLA, every defect raised, every milestone, every payment publishes on the Open Ledger. The maintenance promise is verifiable, not rhetorical.

Mobility Authority owns the plan

Operators bid against the plan

The Mobility Authority owns the route plan as a statutory function. Operators (public + private) bid for routes — they cannot capture the planning function.

Ask the manifesto anything about Cities 2.0.

The TPM bot answers from the manifesto itself — cited to Volume, Chapter, and Section. Works in Kannada and English.

Open the chat
Next sector: Agriculture · Ch 10 → All 12 sectors Open Ledger